Construction draw inspections, built for lender risk teams.

Every draw funded against unverified work is exposure on your balance sheet. We close that gap with on-site verification and clear, defensible documentation.

What a Rusick draw inspection includes

Each inspection is a complete, standalone underwriting artifact. Whether you're funding a single SFR rehab or a portfolio of ground-up builds, the deliverable is consistent — so your team can review with confidence.

Request pricing
  • On-site visit by a trained inspector
  • Verification of work completed against draw request
  • Percent-complete assessment by line item
  • Geotagged, timestamped photo evidence
  • Comparison to prior inspection and project budget
  • Notes on quality concerns, schedule risk, and site conditions
  • Delivered as a PDF report in 24–48 hours
  • Direct line to the inspector for lender follow-up questions

Inspection types we cover

Initial / pre-funding

Baseline site documentation before the first draw. Confirms scope, existing conditions, and starting point.

Progress draws

Recurring inspections aligned to your borrower's draw schedule. Verifies completion line-by-line.

Final inspection

Closeout documentation confirming substantial completion before final disbursement.

Ground-up construction

SFR, multi-family, and small commercial new builds across the Wasatch Front and beyond.

Rehab and value-add

Fix-and-flip and BRRRR projects with itemized scope verification against borrower budgets.

Specialty visits

Stop-work documentation, dispute support, and re-inspections on request.

Sample report

What you'll have in your inbox.

Every inspection is delivered as a clean, paginated PDF — built for underwriting review. Photo evidence sits side-by-side with line-item completion percentages, prior-draw comparison, and inspector notes.

  • Cover sheet with property, draw #, and date
  • Line-item budget with % complete
  • Geotagged photo grid per scope area
  • Inspector notes and risk flags

Draw Inspection Report

1248 N Maple Ave, Lehi UT

Draw #3 · Inspected May 12, 2026

Overall

62%

Framing
Roof
Mech.
Foundation100%
Framing95%
Roofing80%
Mechanical rough-in55%
Drywall10%

Inspector note: Mechanical rough-in on schedule. No quality concerns observed. Recommend release of Draw #3 at 62% as requested.

Set up your inspection workflow.

Volume pricing available for active lenders.

Contact us